Auto-Detect cost savings are calculated by estimating the labor cost associated with necessary on-site operations that may be required at each reader when updating the access control panels to convert the communication protocol from Wiegand to OSDP (Technician’s time X Technician’s hourly rate X number of readers) This does not include the cost savings realized by utilizing existing wire runs.